Project NameEnhanced Reinstatement Works at the Waterfront Areas near Hung Hing Road
Construction Period2022-2023
Project Introduction1. Design and construct stainless steel railings
2. Design and install street lamps
3. Design and install electrical system
4. Design and install water supply system
5. Textured floor paint